Smu ACCESSORY

Quality Control From Material To Shipment

QC System & Team

Control gates buyers can read at a glance.

Instead of long explanations, the page now shows how quality risks are filtered before production, during production and before shipment release.

01

Sample
Review

Material / Structure / Logo / Packing

02

Material Check

Leather / Lining / Hardware / Color

03

Inline QC

Stitching / Shape / Function / Consistency

04

Final AQL

Critical / Major / Minor Defects

05

Shipment Release

Packing / Label / Carton / Approval

Before Production

During Production

Before Shipment

AQL Standard

Release checks built around real order risks.

Final inspection follows the confirmed sample, buyer packing file and AQL sampling level before shipment release.

AQL 2.5-4.0

Inspection sample size and acceptance criteria can be aligned to the buyer’s protocol before final shipment approval.

QC photo records cover carton marks, packing, weights, sample comparison, full product views and defect details for claim review.

Critical

Safety or compliance risk, unusable function, severe strap or handle failure, or unresolved buyer-required test issue.

Major

Material mismatch, wrong logo, visible workmanship issue, failed zipper or hardware function, incorrect packing or label.

Minor

Small mark, loose thread, slight edge paint variation, minor measurement tolerance or light visual difference.

QC Photo Records

Inspection moments, ready for buyer review.

Compliance Support

Testing support for buyer programs.

Final inspection follows the confirmed sample, buyer packing file and AQL sampling level before shipment release.

Chemical safety controls.

Restricted substance review is grouped with sample preparation and lab follow-up, keeping compliance decisions close to the testing workflow.

Material Performance

Hardware Function

Chemical Safety

Lab Coordination

Send your quality requirements.

Share your AQL level, inspection checklist, restricted substance list or testing protocol. We will align the QC flow around your buyer program.